Sunday, November 1, 2009

November Update

We have power to the farmstore, a functioning septic system, and a locked air tight building. The exterior is complete with the exception of some trim painting. The interior insulation will be done the first week November and should pull together the exposed truss ceiling system I have envisioned.

As for the farm, we have covered the base of each tree with hay to deter weed growth. Additionally, the culvert is complete which will allow management of the back timber stand. The ash from the burn pile will enrich the soil in the future vineyard and hops yard.