Well, we got alot done in July. The footings were set, the walls erected, trusses set, irrigation mainline complete! Thanks to the help of our wonderful subs, the construction quality is top notch and I am thrilled with the results. The apple trees are looking incredible - the cherries are hanging on for dear life. Goals for the next month..
1.) Roof steel installed. DONE
2.) Siding installed. DONE
3.) Door and garage door opener installed. DONE
4.) Windows installed. DONE
5.) Well equipment moved inside. DONE
6.) Electric panel installed. DONE